Space Cost Overrun on the Aeropropulsion Systems Test Facility: Plrd-82-123
| Publisher: | Unknows |
| Published In: | 07-Aug-2013 |
| ISBN-10: | 1289292965 |
| ISBN-13: | 9781289292966 |
| Binding Type: | Paperback |
| Weight: | 90 gms |
| Pages: | pp. 24, 50:B&W 7.44 x 9.69 in or 246 x 189 mm (Crown 4vo) Perfect Bound on White w/Gloss |
The Title "Space Cost Overrun on the Aeropropulsion Systems Test Facility: Plrd-82-123" was published in the year 0720. The ISBN number 1289292965|9781289292966 is assigned to the Paperback version of this title. This book has total of pp. 24 (Pages). The publisher of this title is Unknows. Space Cost Overrun on the Aeropropulsion Systems Test Facility: Plrd-82-123 is currently Not Available with us.You can enquire about this book and we will let you know the availability.